Description
The work consists of the construction of a new one story building, approximately 2,700 GSF. The building will be located on the airfield but the AOA fence will be relocated temporarily so that most of the construction work will be outside the AOA. Site work includes utility relocation, new utilities serving the building and site, and paving. The building is concrete unit masonry construction and aluminum storefront, with a standing seam metal roof supported by open web steel joists. The foundation is a mat slab with helical piles. The scope includes mechanical, electrical, and plumbing. Most building systems are exposed, with ceilings in selected spaces only. The program spaces include processing and testing labs, office space, a break room, storage rooms and building support spaces.
Contract Manager
Luis Moreno
Contact Phone
(650) 821-5554
Contact Email
Luis.Moreno@flysfo.com
Estimated Cost Range
$3,300,000
Duration of Contract
500 Total consecutive calendar days
Bid Due
Aug 21, 2018 (Tuesday)
Time Due
10:00 am
Prebid Date
Addenda & Additional Files
Last Update:  2018-08-22 Show
Date Type Summary
07/25/18 Pre-Bid Materials
Pre-Bid Materials
Log in to view the link
08/08/18 Addendum
Addendum 1
Log in to view the link
08/13/18 Addendum
Addendum 2 -Among the revisions is the change to the bid date.
Log in to view the link
08/14/18 Addendum
Addendum 3
Log in to view the link
08/22/18 Bid Results
Bid Results
Log in to view the link