Boarding Area 'G' and Airfield Fire Hydrant Improvements

This contract is archived. It is no longer possible to bid on this contract.

View Bid
results
You must be logged in to view Bid results
Contract Number
10585.61
Department
Planning, Design and Construction
Description
The scope of Work for this Project is to install approximately one hundred (100) feet of underground piping, nine hundred (900) feet above ground piping, and three (3) fire hydrants to replace the existing corroded waterline at Boarding Area 'G'. In addition, approximately five thousand five hundred (5,500) feet of new underground water line and two (2) new fire hydrants will be installed near Runway 28L.
Contract Manager
Fredrick Sabour
Contact Phone
650-821-5549
Contact Email
fredrick.sabour@flysfo.com
Estimated Cost Range
$3,900,000 to $4,500,000
Duration of Contract
240 total consecutive calendar days
Bid Due
Aug 01, 2019 (Thursday)
Time Due
Prebid Date
Jul 18, 2019 (Thursday)
Prebid Time
09:30 am
Addenda & Additional Files
Last Update:  2019-08-01 Show
Date Type Summary
07/18/19 Pre-Bid Materials
Pre-Bid Materials
Log in to view the link
07/23/19 Addendum
Addendum No. 1
Log in to view the link
07/25/19 Addendum
Addendum No. 2
Log in to view the link
08/01/19 Bid Results
Bid Results
Log in to view the link
Last Update: Aug 09, 2019 (Friday) Download
this contract
You must be logged in to download contracts