Design-Build Services for Energy Management Control System Project

This contract is archived. It is no longer possible to bid on this contract.

Contract Number
11068.66
Department
Planning, Design and Construction
Description
An Energy Management Control System (EMCS) is a system comprised of hardware and software that manages and controls a building's use of energy for heating, ventilation, air conditioning, water, gas and electricity. At SFO the EMCS would connect to all buildings and provide campus-level management and control.
Contract Manager
Raniel Camacho
Contact Phone
650-821-5456
Contact Email
Raniel.Camacho@flysfo.com
Estimated Cost Range
$50,000,000
Duration of Contract
1518 consecutive calendar days
Bid Due
Dec 05, 2017 (Tuesday)
Time Due
06:00 am
Prebid Date
Addenda & Additional Files
Last Update:  2017-11-16 Show
Date Type Summary
10/20/17 Other
Addenda #1
Log in to view the link
11/01/17 Other
Addenda #2
Log in to view the link
11/16/17 Other
Addenda #3
Log in to view the link
Last Update: Jul 13, 2018 (Friday) Download
this contract
You must be logged in to download contracts