11144.76
Department
Planning, Design and Construction
Description
The work includes installation of seven (7) new automatic telescoping doors within the central garage at the 1st level between the existing elevator cores and tunnels. This work will be performed within the pre-security area of the airport. Access will be provided into the Central Garage with dedicated areas for contractor staging and storage. The work includes, but is not limited to, the installation of seven (7) new automatic telescoping doors, demolishing and modifying portions of the existing ceilings, select demolition and repair of wall and flooring finishes, installation of framed gypsum wall board soffits, new electrical service from existing panelboards located within the garage, and new airport directional signage. Ancillary work will include relocation of existing illuminated exiting signs, and existing recessed light fixtures.
Contract Manager
Dirk Kellum
Contact Phone
650-821-7859
Contact Email
dirk.kellum@gmail.com
Estimated Cost Range
$1,200,000
Duration of Contract
165 total consecutive calendar days
Bid Due
Feb 08, 2018 (Thursday)
Time Due
Prebid Date
Addenda & Additional Files
Last Update:  Show
Date Type Summary
01/31/18 Addendum
Addenda #1
Log in to view the link
12/10/19 Bid Results
Bid Results
Log in to view the link
Last Update: Jul 13, 2018 (Friday) Download
this contract
You must be logged in to download contracts